Our company deals with the hydro electric power projects on small, mini and micro level.Currently we are working on 2*250KW hydro electric power project in Azad Kashmir.
Our 2nd party in hydro electric power project is CHONGQING ZHONGXIAN
Three Gorges Hydropower Equipment Manufacturing Co. Ltd.
Pakistan is still a net importer of energy and it spends about 30% of total imports, to import oil to meet its energy needs. The gap between the demand and supply in the past was met through installation of thermal power projects based on costly imported fuel. This situation disturbed the Hydel- thermal mix ratio from 65:35 to 35:65 which had resulted into unbearable increase in electricity tariff besides increasing dependency on imported fuels for energy need of the country. To explore and utilize renewable energy resources and mitigate dependence on imported fuels is the need of time.
Energy demand in the country is increasing at rate of 8 to 10 % per annum. The gap between demand and supply has always been increasing. Punjab is fortunately endowed with Hydel Power on canal falls/barrages which is predominately low head with high volume of discharge. In the past, the hydel potential on canal falls/barrages could not be exploited due to non availability of cost effective technology for low heads. With the recent technological development, it is now possible to exploit the potential on canal and barrages.